If there is any component failure or problem, it will cause the equipment to be shut down, and the planned shutdown will bring the loss.
如果平台任何部件出现故障或问题,那么必将导致设备停工,而计划外的任何设备停工都会带来损失。
The oil reservoir shall act as a barrier to trap moisture and provide sufficient time for a planned shutdown in the event of an outer seal failure.
油箱应该在外部密封失效、设备关闭的一段时间内具有防潮屏障的功能。
Failover is the planned or unplanned shutdown of the primary system and includes the accompanying task of bringing a standby node online to take over the processing load.
故障转移是主系统在计划内或计划外的关闭,并包括完成将备用节点置于在线以接管处理负载的任务。
应用推荐